Page 438 - International safety guide for oil tankers and terminals
P. 438

INTERNATIONAL SAFETY GUIDE FOR OIL TANKERS AND TERMINALS



               Electrical storms                             F
                  electrical storms 16.3; 26.1.3
                  rigging and use 26.4(4); 26.5.5 ารศึกษาเท่านั้น---
                                                             Fans
               Electrostatic                                    gas freeing 11.4.5; 11.4.6
                  – see Static electricity                      pumproom ventilation 10.11.5; 26.4(46)
               Entry permitห้องสมุด ศูนย์ฝกพาณิชย์นาวี
               Emergency                                     Fendering
                  command centre, tanker 9.9.2.2                jetty fendering systems 17.2; 26.4(2)
                  communications 20.2.3.3                       operating limits for berthing 17.2.1; 22.3.2
                  control centre, terminal 20.2.2               of tugs and other craft 23.3.2; 24.9.4
                  escape routes 21.2.1; 24.10.2; 26.4(47)
                  evacuation Chapter 21                      Filters
                  medical facilities 20.2.7.4                   electrostatic hazards 3.1.2; 3.3.1;11.1.7.10
                  organisation 9.9.2.2; 20.2.2                  in sample lines 2.4.13.3
                  plans 9.9.2; 20.2; 20.4
                  preliminary action 9.9.2.3                 Fire
                  preparedness, terminal Chapter 20             alarm 9.9.2.4; 9.9.3.1; 19.3; 26.5.2
                  procedures Chapter 20; 10.6; 26.5             alongside a terminal 26.5.2
                  release of cargo hose/arm 18.1.10; 24.6.5     class ‘A’, combustible material 5.2.1
                  release of ship 11.1.6.10; 26.4(2); 26.5.4    class ‘B’, hydrocarbon 5.2.2
                  removal from berth 20.5; 26.5                 class ‘C’, electrical equipment 5.2.3
                  services 20.2.7                               class ‘D’, combustible metals 5.2.4
                  shutdown 11.1.6.3; 26.4(25)                   connection, international shore 8.1.2;
                  signals 22.1.2; 22.4.1.1; 22.4.2.1;             19.5.3.5; 19.6; 26.4(28); 26.5.3;
                                                                on berth 26.5.1 ึ
                     22.4.2.2; 22.5; 22.6; 25.2; 26.4(25)         Figure 26.2
                  towing-off pennants 26.4(4); 26.5.5           control plans 9.9.2.5; 26.4(18)
                  training and drills 9.9.2.7; 21.4             instructions notice Figure 26.1
      ---ใช้เพื่อก
               Emergency towing-off pennants                    pumps at a terminal 19.5.3.2
                                                                training and drills 9.9.2.7; 21.4
                                                                types of 5.2
               Enclosed spaces                                  wires 26.4(4); 26.5.5
                  – definitions
                  entry into Chapter 10, 7.1.6.12; 7.1.7.3;  Fire-fighting
                     12.5.3                                     blankets in galley 4.2.3
                  evacuation from 10.6.1                        cannons (monitors) 19.5.2; 19.5.3.8
                  gas freeing 11.4.2                            carbon dioxide 5.3.2.2
                  inspection of 24.4                            carbon dioxide extinguishers 19.5.2
                  oxygen deficiency 10.2.5                      carbon dioxide flooding 8.1.3.1
                  permits to work in 9.3; 10.4                  cooling, fixed systems 5.3.1; 8.1.2
                  respiratory hazards 10.2.2                    dry chemical extinguishers 5.3.3.1; 12.5.6;
                  toxic hazards 10.2.4                            19.5.2; 24.8
                                                                emergency services 20.2.7
               Engine room                                      equipment, access to 20.2.5
               Explosimeter งาน – definitions                   extinguishers 8.1.4; 12.5.6; 19.5.2
                  cargo oil, exclusion from 11.3.6.7
                                                                equipment, maintenance 9.9.2.6
                  control of potential ignition sources 4.2.4
                                                                equipment, readiness of 9.9.2.6; 19.2.2;
                                                                  24.8; 25.4.3(9); 26.4(5),(6)
                                                                fixed system 8.1.2; 8.1.3; 19.5.3
                  – see also Enclosed spaces; Permit to
                                                                foam 5.2.2; 5.3.2.1; 8.1.3.2; 19.5.2;
                     work system
                                                                  19.5.3.7; 19.5.3.8
                                                                Hot Work precautions 9.4.3.1
                  – see Combustible gas indicator               hoses 8.1.2; 19.5.3.3; 24.8; 26.4(5)
                                                                hydrants 8.1.2; 19.5.3.3; 19.5.3.4; 19.5.3.7
                                                                inert gas system 8.1.3.5
               Explosion-proof (flame-proof)                    monitors (cannons) 19.5.2; 19.5.3.8
                  – definitions                                 packaged cargo 12.5.5; 12.5.6
                  cable attachment 4.3.2                        plans, tanker 9.9.2.5; 26.4(18)
                  inspection of fittings 4.4.4.6                plans, terminal 20.2.4
                                                                protective clothing 19.7


      404                                      © ICS/OCIMF/IAPH 2006
   433   434   435   436   437   438   439   440   441   442   443