Page 320 - International safety guide for oil tankers and terminals
P. 320

INTERNATIONAL SAFETY GUIDE FOR OIL TANKERS AND TERMINALS



                         in the terminal. The training should also include details of typical equipment installed
                         on board ships and related operating procedures.
      ---ใช้เพื่อการศึกษาเท่านั้น---
                         Ship and shore personnel should agree any constraints associated with the operation
                         of the vapour emission control system during pre-transfer discussions. Confirmation
               งานห้องสมุด ศูนย์ฝกพาณิชย์นาวี
                         that this information has been exchanged and agreed will be included within the
                         Ship/Shore Safety Check-List (see Section 26.3.3, Question 32).

                         Section 11.1.13 should be referred to for information on the primary safety issues
                         relating to cargo transfer operations using vapour recovery.





















                                                                          ึ























































      286                                      © ICS/OCIMF/IAPH 2006
   315   316   317   318   319   320   321   322   323   324   325