Page 374 - Ship Construction.DJ Eyres 6Ed
P. 374
Index-H8070.fm Page 363 Monday, October 30, 2006 2:24 PM
Index 363
Pillars, 203–208 Rudder(s), 239–41
Pipe modules, 138 bearing, 241
Piping arrangements, 298–308 construction, 239
Planing machines, 127 pintles, 239
Plasma–arc cutting, 92 post, 237
Plasma Welding, 87, 88 stock, 241
Plate: trunk, 241
butts, 174 Run, 12
edge preparation, 100
Quarter ramp, 291 ช้เพื่อการศึกษาเท่านั้น---
handling, 126 Sacrificial anode systems, 315
machining, 126–31 Safety convention certificates, 337
preparation, 124–6 Safety conventions, 336
of keel, 10, 11 นห้องสมุด ศูนย์ฝกพาณิชย์นาวี
profilers, 126 Sampson posts, 277–78
rolls, 129–31 Scale lofting 10/1, 119
seams, 116 Scissors lift, 295
Poop structure, 222 Scrieve board, 119
Poppets, 147, 150 Scuppers, 301, 349
Portable decks, 294 Sea inlets, 302–303
Post-panamax, 14 Secondary barrier protection (LNG), 268
Pounding, 66, 169–70 Section machining, 126–31
Prefabrication, 136–46 Section preparation, 124–6
Presses, 129 Section Profilers, 132
Priming paint, 125–6 Segregated ballast tanks (SBTs),
Proof stress, 56 27, 251
ึ
Propeller post, 237 Semi-membrane tanks (LNG, LPG),
Propellers, 245 266, 273
Propulsive performance, 5 Semi-pressurized tanks (LPG), 270
Protective coatings (Paints), 24, 170, 259, Semi-refrigerated tanks (LPG), 270
314, 317, 319, 320 Service speed, 5
Pumping arrangements, 251, 304 Shaft:
Purchase of new vessel, 6–7 bossing, 243–5
--- ใ
tunnel, 299
Sheer, 11
Quenching, 45 Shedder plate, 194, 197
forces, 62
Rabbet, 237 strake, 175
Racking, 66 Shell:
Radiographic testing, 104, 106 butts, 174
Raised quarter deck, 15 expansion, 116
of stem, 11 า ง plate identification, 124
Rake: framing, 176–8
seams, 174
Refrigerated cargo stowage, 328 plating, 116, 174–8
Refrigerated container ships, 330 Shelter deck, 17
Refrigerated containers, 330 Ship:
Refrigeration systems, 328 design, 3
Rise of floor, 11 drawing office, 115–23
Riveting aluminium, 53 lifts, 157
Rivets aluminium, 53–54 stresses, 60–71
Robotics, 132 types, 15–31
Roll on–roll off (Ro-Ro) ships, Shipbuilding process, 112
19–21 Shipboard Cranes, 286
Round of beam, 11 Ship Product Model, 120, 123

