Page 372 - Ship Construction.DJ Eyres 6Ed
P. 372
Index-H8070.fm Page 361 Monday, October 30, 2006 2:24 PM
Index 361
Electro-slag welding, 88 General service pumping, 301–302
Elephants foot type cargo lashing, 295 Gouging, 95
End launching, 147–8 Gross tonnage, 339
Entrance, 12 Ground ways, 150
Erection welding sequences, 101 Guillotines, 129
Expansion tank (or trunk), 25, 251 Gunwale, rounded, 175
Extreme dimensions, 10
Half beams, 215
Fairing ship lines, 116 Half breadth, 11
--- ใช้เพื่อการศึกษาเท่านั้น---
Fatigue fracture, 70 Half siding of keel, 11
Feeder, 14, 288 Handysize, 12, 14, 24
FEU, 12 Handymax, 12, 14, 288
งานห้องสมุด ศูนย์ฝกพาณิชย์นาวี
Fillet welds, 97, 101 Hardening, 45
Fire: Hatch(es), 215–19
doors, 355 coamings, 216
protection (aluminium), 54, 352–6 covers, 21, 216, 334, 348
zone bulkheads, 355, 356 (tankers), 258
Fitting out basin, 111 Hawse pipes, 231–3
Fitting out berth, 111 Heat line bending, 122, 131
Flame planers, 127 Heat treatment of steels, 44–5
Flare, 11 High tensile steels, 46–7
Flat plate keel, 161, 174 Hold ventilation, 327
Floating production and storage unit Horizontal girders, 200
(FPSO), 161, 174 Hovercraft, 29
ึ
Floating storage unit (FSU), 261 Hull form, 5, 6, 10, 21, 120, 228, 247
Floors, 166 Hull Planned Maintenance Scheme, 41
Fore end structure, 226–33
Fore end tankers, 259 Ice:
Forecastle, 221 classes, 38
Frame bending, 131–4 strengthening, 260
Framing, 174–89 Ice Strengthening, 38, 260
(tankers), 251 IMO gas carrier code, 266–71
Freeboard, 11, 343–7 IMO oil tanker categories, 14
conditions of assignment, 347–51 Impact test, 57–9
computation, 343 Impressed Current Anti-Fouling
minimum, 346–7 Systems, 320
timber, 346–7 Impressed current systems, 315
Freeing ports, 350 In-water surveys, 40
Fully-pressurized tanks (LPG), 264 Independent tanks (LNG, LPG),
Fully-refrigerated tanks (LPG), 270 266, 301
Independent type A tanks (LNG), 271
Galvanic corrosion, 310 Independent type B tanks (LNG),
Galvanic series, 310 271–3
Garboard strake, 162 Inert gas system, 307
Gas carriers: Inner bottom, 165
general arrangement, 273 Insulation-refrigeration, 328–30
Lloyd’s classification, 274 Integral tanks (LPG), 266
Gas: International Association of Classification
cutting, 92 Societies (IACS), 35
shielded arc welding, 83 International Maritime Organization
welding, 76, 78, 89 (IMO), 335–7
General arrangement, 273 Intercostal members, 163
General service piping, 301–302 Intermediate surveys, 39

