Page 300 - Ship Construction.DJ Eyres 6Ed
P. 300

Ch24-H8070.fm  Page 289  Wednesday, October 18, 2006  7:00 AM
                                         Lifting Arrangements                    289
                 have been installed on one side of the hull in order to perform a tandem lift
                 with a maximum capacity of 1600 tonnes.



                 Further Reading

                 ‘Cargo Work for Maritime Operations’ David J House Elsevier
                      --- ใช้เพื่อการศึกษาเท่านั้น---
                 ‘Code for Lifting Appliances in a Marine Environment (2003)’ Lloyds Register
                 British Standards Institution, BS MA 48.1976 Code of Practice for Design
                          งานห้องสมุด ศูนย์ฝกพาณิชย์นาวี
                   and Operation of Ships Derrick Rigs.
                 British Standards Institution BS MA 47.1977,  Code of Practice for Ships
                   Cargo Blocks
                 British Standards Institution BS MA 81:1980, Specification for Ships Derrick
                   Fittings

                 British Standards Institution, BS MA 79:1978, Specification for jib cranes:
                   ship mounted type

                                                          ึ
                 Some Useful Web Sites
                 www.macgregor-group.com    see General cargo ships – Cranes
   295   296   297   298   299   300   301   302   303   304   305