Page 274 - Ship Construction.DJ Eyres 6Ed
P. 274
Ch22-H8070.fm Page 263 Wednesday, October 18, 2006 6:59 AM
Tanker Construction 263
pump rated at 300 cubic metres per hour and the ships maximum discharge
rate is 1800 cubic metres per hour with six lines working at the same time.
Further Reading
‘Code for the Construction and Equipment of Ships Carrying Dangerous
--- ใช้เพื่อการศึกษาเท่านั้น---
Chemicals in Bulk (BCH Code)’ 2005 Edition, IMO Publication,
(IB772E)
‘Common Structural Rules For Double Hull Oil Tankers’ IACS Publication
งานห้องสมุด ศูนย์ฝกพาณิชย์นาวี
‘Design and Operation of Double Hull Tankers’ 2004 Conference Pro-
ceedings and Papers. Royal Institution of Naval Architects Publications.
‘International Code for the Construction and Equipment of Ships Carrying
Dangerous Chemicals in Bulk (IBC Code)’ 1998 Edition, IMO Publica-
tion, (IMO-100E).
‘MARPOL 73/78 Consolidated Edition 2002’, IMO publication (IMO
1B520E)
‘MARPOL 2005 Amendments 2005’, IMO publication (IMO 1525E)
ึ
Some Useful Web Sites
www.intertanko.com Current regulatory and technical issues relating to
oil and chemical tankers.
www.imo.org ‘Safety’ see Tanker Safety
www.iacs.org.uk see ‘Common Structural Rules for Double Hull Oil Tankers’

