Page 241 - Ship Construction.DJ Eyres 6Ed
P. 241
Ch20-H8070.fm Page 230 Wednesday, October 18, 2006 6:59 AM
230 Ship Construction
Fo’c’sle deck
Pillar
Upp. deck
--- ใช้เพื่อการศึกษาเท่านั้น---
Deck girder
Ships
L
Pillar Breast hooks
งานห้องสมุด ศูนย์ฝกพาณิชย์นาวี
Transverse
Crown of fore peak tank
SECTION AT
TRANSVERSE
Stringer
No. 4 stringer
FORE
PEAK Web
No.3 stringer Stringer
Fore peak
bulkhead ึ
Non W.T. flat
No. 2 stringer STRINGER
Breast hooks
Transverse
No. 1 stringer STRINGER
Transverse
FIGURE 20.3 Bulbous bow
deck forming the crown of the locker. Each cable is fed to the appropriate
locker compartment through port and starboard chain pipes from the
forecastle deck. These chain pipes or spurling pipes are of tubular con-
struction with castings or other rounded end mouldings to prevent chafing.

